Friday, August 19, 2011

Landing Gear, Batteries, and Oil Changes, Oh My!

Checking landing gear rigging is part of the annual inspection process for GCI's Cessna 310. Under Tim and Scott's supervision, apprentice mechanics Ben, Andy, and Paul G. gained some great maintenance experience checking tensions, pressures, limits of travel, and various linkages, and developed a high level of appreciation for how a tiny adjustment in one part of a complex system can have a major impact in another part of the system.

Andy measures the release tension on the right main gear "down-lock" to make sure it's within limits.

Finished with the landing gear, Ben moved on perform engine maintenance.

In between their other tasks, several apprentices are also learning proper methods of battery servicing and "rejuvenation". If you have the time (and it does take time), it is possible to rejuvenate a tired battery, bring it back to health over the course of several days, and save the resources that would otherwise go to purchasing a replacement battery.

Mark checks the fluid in a battery undergoing rejuvenation.

Bob Schwartz, MMS Training Director, has initiated a program where our apprentice mechanics gain several hours of ground school and flight orientation to better help them understand how their maintenance integrates with aircraft operation. Ben Fisher, one of our apprentice mechanics, is also a Certified Flight Instructor. He recently led a class on radio navigation to help the apprentices understand how pilots use VOR's to determine their location in flight.

Ben leads a class in the theory of radio navigation.

The Pfeifer Evangelical Association flew their Aztec in for an oil change and some troubleshooting. The oil change was routine but the troubleshooting indicated the alternator on the Aztec's left engine needed repair. After the repair was made, the airplane was returned to service.

The Pfeifer's Aztec returns to service.

The variety of maintenance tasks that happen in our hangar every day is wide and varied providing a unique environment in which our apprentices can grow into professional, competent and confident mechanics.Thanks for being part of this process through your ongoing gifts and your prayers.

Friday, August 12, 2011

Heading Into The Weekend

As we head into the weekend, I'd like to leave you with the latest video of the Cessna 207 we're restoring for Air Calvary's use in Gabon, Africa. Removing the damaged tail cone was the beginning of the final major structural task in the restoration. Yes, there's still a couple more months worth of work to complete, but once the new tail cone is in place the fuselage can be repainted and the wings and control surfaces and all the other major components can come together in the most literal fashion.

Thanks for your ongoing prayers for this project, our mechanics, and our ministry.


Wednesday, August 10, 2011

Manpower Is Poured On The 207 And The 310

Air Calvary Cessna 207
Dale and his maintenance crew crew continue to push Air Calvary's 207 restoration toward completion. Since our last blog post the damaged tail cone was removed from the fuselage and assembly of the new tail cone has begun. Also, with the new rear, wing-spar carry-through installed, the guys spent a good portion of today test fitting the wings.

Chuck, Josh, Dale, and Andy S. finish removing the 207's damaged tail cone.

Dale and Andy discuss the next step in assembling the new tail cone.

Jim, Josh, Phil, Andy, Dale, and Chuck install the 207's right wing.

Phil and Chuck secure the left wing strut in place.

After the test fit, the wings will come off again and be set aside until the final few weeks of the project. After the remaining structural repairs are completed and the fuselage has been re-painted, the wings will go back on and be rigged for its October return to service flights.

GCI Cessna 310
Gospel Carrier International's Cessna 310 is back in the hangar for its annual inspection. Scott is overseeing the crew and providing instruction on the inspection process.

Paul and Andy P. inspect and test the 310's landing gear retraction system.

Scott inspects the 310's nose gear assembly.

Thanks for your continued interest, gifts, and prayers that make it possible for each of us to use our God given gifts to prepare airplanes and our apprentice mechanics for service on the mission field.

Thursday, July 28, 2011

Video Update on the Gabon 207

Here's the latest video on the Gabon 207 restoration project. Dale's crew has really hit their stride and are on track to have this project wrapped up early this fall. I was down in the hangar yesterday shooting fresh footage of the guys removing the tail cone.

Wednesday, July 27, 2011

A 310, A 182, And A 207

Gospel Carrier International's Cessna 310 Arrives.
With the arrival of GCI's Cessna 310 for annual inspection, GCI's 172 Cessna departed, but yes, the hangar is still filled with Cessnas.

GCI's Cessna 31o is the twin-engine airplane on the left.

Work On The 182 Continues
Mike, Jim, Andy P., Mark, Paul, and Ben continue to push the Cessna 182's annual inspection toward completion. Some corroded components needed to be replaced, work on the nose gear was completed, some discrepancies were found in the exhaust system, and some structural repairs are being taken care of inside the cabin. The project is providing good operational maintenance experience for our apprentices.

Mark works with the 182's exhaust system.

Paul performs maintenance on the 182's nose gear.

Continued Progress On The Gabon 207
Another major step was initiated today on the Gabon 207 as the tail cone was removed from the cabin portion of the fuselage. The tail cone was substantially damaged in the airplane's forced landing and with its removal, the way is cleared for this last major component repair.

Chuck, Josh, and Dale begin removing the tail cone of the 207.

Chuck and Josh remove skin panels as Dale drills-out additional rivets.

Dave & Guido
Part of the recent "Raise The Roof" fundraising effort was to purchase a newer piece of equipment for mowing and snow removal. After extensive research, a barely-used Kubota F3060 was purchased. The F3060 has since been affectionately named "Guido" after a similar looking character in the original "Cars" animated movie. Dave is greatly enjoying the power and torque generated by its 30 horsepower diesel engine.

Dave puts Guido through its paces.

Thanks for your gifts and prayers which make our ministry possible. We couldn't be here doing what we're doing without you back there doing what you're doing!

Tuesday, July 19, 2011

Cessnas Everywhere

All three of our hangars are loaded with Cessnas right now.

In Hangar A we have three Cessnas being worked on--two Cessna 172's and a 182.

Three Cessnas in Hangar A

Ben and Mark inspect the 182's air box.

In Hangar B the amphibious Brazilian 206 waits for its return-to-service flights while the Cessna 402 waits on parts and funding.

The Cessna 402 and 206 in Hangar B

In Hangar C, MMS grad and Missionary Aviation Group member, Paul Jones continues to work on their Cessna 206 for Guatemala. He's currently installing the cargo pod on the belly of the aircraft.

MAG's 206 with cargo pod.

Also in Hangar C, the Gabon Gabon 207's static system is being tested while structural repairs continue.

Dale tests the 207's static system as Phil assists inside the fuselage.

Chuck drills-out rivets to facilitate the removal and replacement of the 207's rear, wing spar carry-through which was cracked in four places.

Thanks for your gifts and prayers that make it possible for us to serve so many different ministries, in so many different ways, for the same purpose: to speed and spread the good news of Jesus Christ to those who have not heard.

Wednesday, July 6, 2011