Tuesday, March 22, 2011

Moving Around The Hangar

As I moved around the hangar taking snapshots, here's some of the activity that caught my eye:

Mark and Mike make the final repairs to a local airplane.

Jim and Andy S. rivet structure into the 402's right engine nacelle.

Andy P. installs components on the 402's left engine.

Dave performs maintenance on a light fixture in Hangar A.

Wednesday, March 9, 2011

It's A Rainy Windy Day in Coshocton

We're having a bit of rain and wind today with the possibility of everything turning to a "wintry mix" of snow/sleet/rain tomorrow. But while the rain and wind lash at the outside of our hangars, the guys just keep on working inside. Good progress is being made on the Cessna 402.

Mike fabricates some structure for the 402.

Mark readies the left nacelle for engine installation.

Jim installs baffling on the 402's right engine.

Paul removes a damaged section of firewall on the Gabon 207.

Wednesday, March 2, 2011

Air Calvary Cessna 207: Project: Part 1 (Remix)

Here's the first video of what, I'm sure, will be an ongoing series of clips featuring the restoration and repair of Air Calvary's Cessna 207.