Thursday, December 3, 2009

Driving, Closing, and Joining

Brazilian 206
Rivets of all shapes and sizes continue to be driven in the Brazilian 206 in preparation for painting the fuselage.

Paul drives rivets to secure the rain gutter he'd just fabricated. Josh bucks from inside.

Honduran 206
The Honduran 206 continues to creep toward completion. Final steps are being taken to clean and "close-up" various aspects of the project!

Andy vacuums beneath the floor panels of the 206 before securing the access plates in place and "closing-up" the floor.

Canadian 337
The airframe repairs and engine overhauls continue simultaneously on the Canadian 337.

Scott and Dale double-check critical data prior to joining the engine case halves for the front engine of the 337.

No comments: