Today, MMS Aviation mechanics work on airplanes of five different missionary/ministry organizations. It's a balmy 61° in Coshocton, a brief break from more typical January temperatures. Last Friday we were reminded again that it is winter in central Ohio.
In the hangars we're quite comfortable, so here is a quick tour of the aircraft maintenance being performed.
After its test run following overhaul, the engine for the LAMP Piper Lance was placed back on the plane by Josh and Andy. Terry finished the installation, attaching hoses, wiring, engine controls, etc.
An annual inspection of this Cirrus SR22 nears completion. A large church in the Chicago area uses this plane in support of its ministry. Jake and Ben have assisted Mike with this project.
Dale shows Andy the plan for modifying this Cessna 206 horizontal stabilizer. Today, they removed the aluminum skins and began repair of the internal structure.
Earlier this week, Dale and Andy took the "tail feathers" off of the MAG Cessna 206. Behind Andy, through the door in hangar B, is the MAF 206 that is being re-assembled after its restoration.
Wings were put back on the MAF 206 a week ago. Chuck and Phil continue the assembly and rigging of all the flight controls as well as fitting a new cargo pod on the fuselage.
Geoff measures the crankcase of a Lycoming engine for a Cessna Cardinal used by a ministry in Wisconsin. Geoff works under the supervision of Josh on this engine overhaul.
Tuesday, January 29, 2013
Wednesday, January 16, 2013
A New Year
January 2nd came right on schedule and the MMS Aviation team returned after the holiday break. Each year the first order of business is to do physical inventory which is a rather mundane task but necessary. Doing inventory is a lot like eating the vegetable you don't like first so you can enjoy the rest of the meal.
| Tables placed near the standard hardware shelves make inventory easier. |
Inventory typically takes a day and a half and is followed by review of the MMS Standard Operating Procedures Manual. Then, and only then, we get back to the fun stuff.
| Andy installs the lifting brackets on the Lycoming engine being overhauled. |
Many annual inspections of aircraft are scheduled during the winter months and MMS has several lined up. Some of these are for ministry organizations and other planes we'll inspect are owned by local people. Regardless, the experience gained by MMS apprentice mechanics doing routine inspections and the maintenance that comes with them is very valuable.
| John, on the right, talks with MMS staff, Josh Adelsberger, about the plane. |
Wednesday, December 12, 2012
MMS on 12-12-12
Just thought I'd post a few pictures of what's happening in the hangar this 12th day of the 12th month in the 2012th year of our Lord.
Andy safety-wires a component of the engine for LAMP's Lance.
Chuck and Geoff apply masking to the rudder of the MAF 206 in preparation for shooting the color coats (red & blue) on the fuselage.
Terry McClary works under instrument panel of the LAMP Lance.
Ben and Bob install the baffling on the 172's new engine.
Safely up from Rus Rus, Honduras this MAG 206 waits for restoration to begin in preparation for its deployment to Guatemala.
Amazon Salt & Light's Cessna 185 awaits paperwork completion and its return to service flight.
Monday, November 19, 2012
N9719Z Has Arrived In Rus Rus
We're pleased to confirm that MAG's Cessna 206 has arrived safely in Rus Rus, Honduras.
The white and red Cessna 206 in the foreground will soon be flown up to us to be inspected, repaired, restored, and prepared for ministry in MAG's new flight program in Guatemala.
N9719Z is in the background on the flight line in Rus Rus.
The white and red Cessna 206 in the foreground will soon be flown up to us to be inspected, repaired, restored, and prepared for ministry in MAG's new flight program in Guatemala.
Monday, October 8, 2012
MAG's Cessna 206 Departs for Service in Honduras
After being modified for operations in remote and rugged locations, Missionary Air Group's (MAG) newly acquired Cessna 206 departed MMS in preparation for its deployment in support of MAG's jungle hospital in Rus Rus, Honduras.
The arrival of this airplane in Rus
Rus will allow the Cessna 206 currently operating in Rus Rus to be flown
to our facility for restoration. After this next 206 is inspected,
restored, and repaired it will be deployed to Guatemala where MAG is
preparing to open a new field of operations.
Wednesday, September 26, 2012
Friday, September 21, 2012
Subscribe to:
Posts (Atom)







