Tuesday, November 25, 2008

Moving Ahead With Moody's 182

With Mike, Ian, David, Gertjan, Chuck, Scott L. and Josh on the job, the restoration of Moody Aviation's Cessna 182 is primary on our production schedule now. The engine has already been inspected and reassembled but the airframe still requires substantial repair.

The 182's fuselage.

Scott, Chuck, and Josh are focused on repairing the fuselage and David, Gertjan, and Ian are preparing the control surfaces for paint.

Scott continues installation of the nose gear.


Chuck pre-fits the components for the rudder pedal assembly.