Monday, November 16, 2009
Wednesday, November 11, 2009
The Best Aviation Maintenance Value Possible
Part of our ministry to those organizations sending us their airplanes is to make sure they receive the best maintenance value possible. If we can make it, we won't buy it; if we can repair it, we won't replace it; and if we have to buy it, we'll shop for the best deal.
The first two photos represent the second condition--that of making a repair so the entire component won't need to be replaced. Instead of replacing one of the Canadian 337's air selector assemblies for $200, Dale fabricated and then installed a bushing for $2.00 worth of stock material.
In our previous post, Paul was pictured inspecting one of the Brazilian 206's wings for fuel tank leaks. That process continued to the point of repair.
The first two photos represent the second condition--that of making a repair so the entire component won't need to be replaced. Instead of replacing one of the Canadian 337's air selector assemblies for $200, Dale fabricated and then installed a bushing for $2.00 worth of stock material.
In our previous post, Paul was pictured inspecting one of the Brazilian 206's wings for fuel tank leaks. That process continued to the point of repair.
Tuesday, November 10, 2009
The Brazilian 206, Honduran 206, and Calendar Mailing
While the Canadian 337 project is gaining momentum (the front engine is nearing build-up), the Brazilian 206 is going to dominate the blog for a bit, but that's okay. It's where the majority of our manpower is going once the Honduran 206 is completed later this month.
Logan drives rivets into a new belly skin on the Brazilian 206 as Josh bucks from inside the fuselage.
In Hangar B, Paul J. troubleshoots a leak in the right wing fuel tank of the Brazilian 206, Ian (on the ladder) fits the rudder tip fairing on its vertical stabilizer and, if you look into Hangar A you'll see the 206's fuselage where Logan and Josh are working.
But not everything is airplanes at MMS. While Rena was in working on receipting donations received over the past four days, Karen, Dana, and Sherry came in to organize the annual mailing of pocket calendars to MMS supporters.
Logan drives rivets into a new belly skin on the Brazilian 206 as Josh bucks from inside the fuselage.
In Hangar B, Paul J. troubleshoots a leak in the right wing fuel tank of the Brazilian 206, Ian (on the ladder) fits the rudder tip fairing on its vertical stabilizer and, if you look into Hangar A you'll see the 206's fuselage where Logan and Josh are working.But not everything is airplanes at MMS. While Rena was in working on receipting donations received over the past four days, Karen, Dana, and Sherry came in to organize the annual mailing of pocket calendars to MMS supporters.
Monday, November 9, 2009
New Skin On The Brazilian 206
Josh finished last week getting new skin prepared for installation on the fuselage of the Brazilian 206. He and Paul J. started this week working together to install the skin on the tail cone. Josh worked outside the tail cone driving the rivets while Paul worked inside bucking the rivets. It takes all kinds of rivets of different shapes, sizes, material, and varied hardness to hold an airplane together.
Josh temporarily fastens the new skin in place with "cleco" fasteners used to secure sheet metal in place for drilling or riveting. Clecos come in all shapes and sizes as required by the job.
Josh temporarily fastens the new skin in place with "cleco" fasteners used to secure sheet metal in place for drilling or riveting. Clecos come in all shapes and sizes as required by the job.Friday, November 6, 2009
Walking Through The Shop
Walking through our shop is always interesting. Right now things are literally "coming together" on several fronts.
Paul Gettle has completed his pre-service orientation and will start Basic Training on Monday morning. This afternoon, Bob provided Paul with his study material and instructed him in how to fill out his maintenance log book.
If you're ever east central Ohio, please make a point to stop by our hangar facility in Coshocton and take a walk through the shop. I guarantee you'll find it worth your time.
Paul Gettle has completed his pre-service orientation and will start Basic Training on Monday morning. This afternoon, Bob provided Paul with his study material and instructed him in how to fill out his maintenance log book. If you're ever east central Ohio, please make a point to stop by our hangar facility in Coshocton and take a walk through the shop. I guarantee you'll find it worth your time.
Wednesday, November 4, 2009
Five Different Directions
At MMS you can be sure that we're always working in several directions at the same time.
Monday, November 2, 2009
Three Airplanes, Four Snapshots
Subscribe to: