While three of our guys are on Rapid Response down in Florida performing an inspection for Missionary Flights International, the work at our own hangar facility continues.
Hangar A: Paul prepares the engine and the systems "firewall forward" for inspection on the Cherokee 140.
Hangar B: Bob and Andy attach a special tool which will allow them to grind the face of an exhaust port back to "square" on a local Cessna 172.
Hangar C: Painting continues on the 182, the ice boots have been installed on the Aztec's left propeller, Josh is putting GCI's 172 back together and the annual inspection on the Cessna 150 is nearly completed.
No comments:
Post a Comment