Tuesday, September 22, 2009

GCI's King Air 200

Gospel Carrier International's Super King Air 200 is in Hangar C to undergo phase inspections #3 & 4.

The King Air in Hangar C.

Ian maintains the left engine.

Chuck works on the nose gear steering system.

Josh, Andy, & Paul refer to the manuals as a regular part of the King Air inspection.

Josh & Andy install the right main gear strut after disassembly, inspection and repair.

The King Air will be with us through next week.

No comments: