Tuesday, January 6, 2009

Inventory is Over

With all the parts, pieces, and raw materials located, identified, counted, measured, and calculated work on Moody's Cessna 182 and the Honduran 206 has resumed.

Scott works inside the cockpit of the Honduran 206.

Tim observes operation of the engine controls
as Josh works them from inside the Aztec.


Under Ian's supervision, David and Gertjan shoot primer
on the Moody 182 flight control surfaces.

.

1 comment:

mom said...

This is a neat way to "see" what the MMS teams are doing.
I enjoy "seeing" my son, Ian on this blog.