With the engine overhaul completed, Dennis and Chuck moved the engine from the engine stand into the test cell and prepared the engine for its test run. After the expected minor adjustments, the engine ran beautifully and is now being readied for installation on the aircraft.
The annual inspection of Gospel Carrier International's Cessna 310 continues.
No comments:
Post a Comment